Update bathroom laundry space in an aged care unit [independent living] in Inverell making access easier
Randall Group where engaged to remove an old leaking shower and update with new user friendly shower and laundry into a one function room with ample new cupboards and new fixtures and fittings in an aged care unit [independent living] here in Inverell NSW
Tenant moved out then we went to work, removing asbestos [as we are licensed asbestos removers] then strip out the rooms to bare walls and floors after having plumbing and electrics capped off.
Framed up new area and then levelled out the floor and then waterproofed.
Re tiled floors and shower area then went to work patching and plastering.
Supplied and installed new fixtures and fittings, along with new robes, laundry area and bathroom vanity see list
Plumber and Electrician fitted out.
Such an improvement and much more functional use of space.
Thank you to all concerned job well done again another job completed in Inverell with all Inverell trades.
Fixtures and fittings list:
Floor Tiles: Marfill 300x300
Wall tiles: White gloss 240X400
Polytec laminated benchtops Provincial Limestone Bench top
Sliding door cupboards coloured panels [Porcelain Matt robes] & mirrored panels
Brushed aluminium kicks
Lincoln arch bow satin chrome handles
Metaline icicle metallic splashbacks
Glass shower shelf with Chrome 495X42X100
Wels 3 star 93/min chrome hand shower set on grab rail
S/s grab rails 300mm, 450mm and 600mm
Shower mixer 40mm
Towel rail 90cm double towel rail
Robe hooks s/steel
Toiler toll holder s/steel
Toilet suite Raised rimless wels4star
Mirrored Shaving Cabinet 2 door 900mm white
Vanity Basin 1TH500 x 420 WHT
Basin Sink Mixer
Painting Dulux Lexicon Quarter